Home | Contact us | Privacy Policy | Imprint |   » German homepage



















REACH-Reports

Die neue europische Bauproduktenverordnung

EPD

Bauchemie-NextStep

QDB e.V.




Description of the publication

Guideline for Planning and Executing Waterproofing with Polymer Modified Bituminous Thick Coatings (PMBC) – Building Elements with Ground Contact – (PMBC Guideline)



Article-No.: 167-RL-E-2012  

Instruction | 3. Edition, May 2010

Download...  

CONTENTS
-------------

PRELIMINARY REMARKS

PART A: GENERAL REQUIREMENTS

  1. RANGE OF USE AND PURPOSE
  2. REQUIREMENTS ON PLANNING
  3. DEFINITION OF WATER LOAD
  4. MATERIALS
  5. REQUIREMENTS ON POLYMER MODIFIED BITUMINOUS THICK COATINGS (PMBC)
  6. OCCUPATIONAL SAFETY, TRANSPORT AND DISPOSAL
  7. REQUIREMENTS ON THE SUBSTRATE
  8. PRELIMINARY WORK
  9. REQUIREMENTS ON THE INSTALLER

PART B: EXECUTION OF WATERPROOFING WITH PMBC ACCORDING TO DIN 18195

  1. SUBSTRATE PRE-TREATMENT
  2. APPLICATION OF THE COATING
  3. PLACEMENT OF THE WATERPROOFING
  4. SERVICE PENETRATIONS
  5. JOINTS
  6. CONNECTIONS
  7. TRANSITIONS FROM PMBC TO FLOOR SLABS MADE OF WATER IMPERMEABLE CONCRETE
  8. PROTECTIVE MEASURES AND PROTECTIVE LAYERS
  9. REPAIRING WATERPROOFING MADE OF POLYMER MODIFIED BITUMINOUS THICK COATINGS (PMBC)
  10. QUALITY ASSURANCE TESTING

 

ANNEX

ANNEX 1: WATERPROOFING WITH PMBC BEYOND DIN 18195

  1. NOTES ON CONTRACTUAL AGREEMENTS
  2. GENERAL REQUIREMENTS
  3. RANGE OF USE

ANNEX 2: QUOTED AND JOINTLY VALID STANDARDS, REGULATIONS AND CODES OF PRACTICE

ANNEX 3: DOCUMENTATION FORM



Reference person

Jana Rumpf
Administration of Publications

Phone: +49-69 / 25 56 - 1606
Fax: +49 69 / 25 56 - 1319

eMail: jana.rumpfnoSpam@vci.de